Gokcek, MuratGenc, Mustafa Serdar2019-08-012019-08-0120090306-2619https://dx.doi.org/10.1016/j.apenergy.2009.03.025https://hdl.handle.net/11480/4984The negative effects of non-renewable fossil fuels have forced scientists to draw attention to clean energy sources which are both environmentally more suitable and renewable. Although Turkey enjoys fairly high wind energy potential, an investigation and exploitation of this source is still below the desired level. In this study which is a preliminary study on wind energy cost in Central Anatolian-Turkey, the wind energy production using time-series approach and the economic evaluation of various wind energy conversion systems (WECSs) enjoying the 2.5, 5, 10, 20, 30, 50. 100 and 150 kW rated power size using the levelised cost of electricity (LCOE) method for the seven different locations in Central Turkey were estimated. In addition, effects of escalation ratio of operation and maintenance cost and annual mean speed on LCOE are taken into account. The wind speed data for a period between 2000 and 2006 years were taken from Turkish State Meteorological Service (TSMS). According to the result of the calculations, it is shown that the WECS of capacity 150 kW produce the energy output 120,978 kWh per year in the Case-A (Pinarbasi) for hub height 30 m and also the LCOE varies in the range of 0.29-30.0 $/kWh for all WECS considered. (C) 2009 Elsevier Ltd. All rights reserved.eninfo:eu-repo/semantics/closedAccessWind energyWind energy conversion systemsCost estimationEvaluation of electricity generation and energy cost of wind energy conversion systems (WECSs) in Central TurkeyArticle86122731273910.1016/j.apenergy.2009.03.025WOS:000270120000022Q1