Sezer H.Erol H.Ayasun S.2019-08-012019-08-012016https://hdl.handle.net/11480/1881Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion, MedPower 2016 -- 6 November 2016 through 9 November 2016 -- -- 126491It is essential to transmit measurements from remote terminal units (RTU) to control centre and control signals from the control centre to plant side, in load frequency control (LFC). Constant delays exist for used media in the conventional communication channels. Those delays would degrade the dynamic performance of LFC system. This paper investigates the delay-dependent stability of the LFC scheme for renewable energy power generation/storage/delivery subsystem. The investigated renewable energy power generation/storage/delivery subsystems include photovoltaic system (PV), wind turbine generator (WTG), fuel cell (FC) system and ultra-capacitor (UC) bank as energy storage system. In this paper, time delay effects of hybrid power systems are analysed by modelling the system via Matlab/Simulink.eninfo:eu-repo/semantics/closedAccessDelay marginDelay-dependent stabilityLoad frequency controlPower generation/energy storage systemsPower systems stabilityDelay-dependent stability analysis of hybrid power systems with time delaysConference Object2016CP7112-s2.0-85014061000N/A