Yazar "Tapan I." seçeneğine göre listele
Listeleniyor 1 - 2 / 2
Sayfa Başına Sonuç
Sıralama seçenekleri
Öğe The status of TAC IR FEL and bremsstrahlung project(2010) Aksoy A.; Yavaş O.; Zengin K.; Ozkorucuklu S.; Tapan I.; Duran Yildiz H.; Arikan P.Turkish Accelerator Center Infrared Free Electron Laser and Bremsstrahlung (TAC IR FEL&Brems.) project aims to produce cw mode FEL in 2.5-250 microns range and to produce bremsstrahlung photons using 15-40 MeV electron beam. The project is supported by State Planning Organization (SPO) of Turkey and is proceeded with inter university collaboration under the coordination of Ankara University. This facility is now called Turkish Accelerator and Radiation Laboratory at Ankara (TARLA) since its building located at Golbasi town 15 km south of Ankara, Turkey. It is proposed that the facility will consist of 300 keV thermionic DC gun, two superconducting RF module and two optical resonator systems with 25 and 90 mm period lengths. In this study, the status and road map of the project is presented including some technical details on accelerator and FEL. In addition the research potential of facility is summarized.Öğe The TAC IR FEL oscillator facility project(2009) Ketenoglu B.; Aksoy A.; Yavas O.; Tural M.; Karsli O.; Ozkorucuklu S.; Tapan I.The TAC (Turkish Accelerator Center) IR FEL Oscillator facility, which has been supported by Turkish State Planning Organization (SPO) since 2006, will be based on a 15-40 MeV electron linac accompanying two different undulators with 2.5 cm and 9 cm periods in order to obtain IR FEL ranging between 2-250 microns. The electron linac will consist of two sequenced modules, each housing two 9-cell superconducting TESLA cavities for cw operation. It is planned that the TAC IR FEL facility will be completed in 2012 at Gölbasi campus of Ankara University. This facility will give an opportunity to the scientists and industry to use FEL in research and development in Turkey and our region. In this study, the results of optimization studies and present plans about construction process of the facility are presented.